What it costs: the comp math in the open, builders risk priced honestly
Anyone quoting you one flat price for "builders insurance" is guessing. Each line prices differently. Workers' comp is built from a published formula, and your number can be estimated from payroll right here. Builders risk is priced per project from the completed value, the construction, and the calendar. Liability and auto are priced from your facts after underwriting. Massachusetts is not an NCCI state: the WCRIBMA files the manual rates, the Commissioner of Insurance rules on them, and the disapproved 2025 filing means the July 1, 2024 rates are still in force.
| Line | What can be said honestly | What moves it |
|---|---|---|
| Workers' comp (class 5645) | $4.60 per $100 of payroll manual rate, eff. 7/1/2024. $300,000 of carpentry payroll is $13,800 of manual premium at a 1.00 mod, before carrier pricing, expense constant, premium discount, and assessments | Payroll by class, experience mod, carrier pricing, audit results |
| Builders risk | No published price exists. Carriers price each project (or each reported start) from the completed value, the construction type, the duration, and the site's protection, so the same builder pays a different rate on a masonry custom home than on a frame spec house | Completed value, frame vs masonry, project length and extensions, deductible, theft and site security, soft costs election |
| General liability ($1M/$2M) | No published price exists. Carriers rate it from your receipts and your work mix after underwriting | Gross receipts, spec vs custom vs development mix, percentage subbed out, completed operations history, claims |
| Commercial auto | No published price exists. Priced per vehicle from the fleet, the trailers, and the drivers | Vehicle type and weight, trailer use, radius of operation, garaging, every driver's record |
| Tools & equipment | Priced from the schedule you declare: machines, trailers, compressors, lifts, hand and power tools | Total scheduled value, replacement cost vs actual cash value, where equipment sleeps, theft controls, deductible |
| Umbrella ($1M) | Priced against your underlying liability and auto premiums; usually the cheapest additional million available | Underlying premiums, lender and contract requirements, completed operations exposure |
The comp rate is the WCRIBMA manual rate for class 5645 effective July 1, 2024 (Circular Letter No. 2431). Manual premium is a starting point, not a quote.
Worked examples, with the arithmetic shown
The governing-class baseline
$300,000 of class 5645 payroll ÷ 100 × $4.60 = $13,800 of manual premium at a 1.00 experience mod. That is the number the estimator starts from, and the number a quote conversation refines with your mod, your carrier, and the charges this estimate leaves out.
The finish split you may be leaving behind
$60,000 of genuine finish carpentry payroll sitting in 5645 is $2,760. Documented properly in 5437 at $2.50, the same payroll is $1,500. The $1,260 difference repeats every year the time records support the split, and disappears at audit if they do not. The split has to be real: 5437 is cabinets and interior trim, not framing described hopefully.
The mod, priced
Take the $13,800 baseline and apply a 1.25 experience mod after a bad claims stretch: $17,250. The mod alone added $3,450, and it stays in your pricing for three years. That is the arithmetic behind managing claims like money.
The uninsured sub surprise, priced in advance
$50,000 paid to a framing sub who hands you no valid certificate can be treated as your payroll at audit: $50,000 ÷ 100 × $4.60 = $2,300 of added premium, billed after the work is done and the house is sold. The subcontractor guide is the system that keeps this line at zero.
How builders risk is actually priced
There is no manual rate to print for builders risk, and any page that quotes a flat percentage without asking about the project is inventing it. Carriers build the price from the project in front of them:
- Completed value. The limit is the finished value of the home, and the premium follows it. Understating the value does not save money; it reprices every claim downward.
- Construction type. Frame construction prices higher than masonry, and a renovation of an existing structure prices differently from ground-up work, when it belongs on an installation floater instead.
- Duration. The policy is written for the expected build time. Extensions are inexpensive while the policy is alive; a build that runs long without one is uninsured at the end.
- Site and security. Fencing, lighting, locked storage, and how materials are staged all bear on the theft exposure, which is the most common builders risk claim on residential work.
- Deductible and wind. Deductible choices, including percentage deductibles for wind where they apply, move the price directly.
- Soft costs. Loan interest, permit and architectural rework, and delay coverage are elected, priced, and either in the policy or not there at the loss.
- Single project vs reporting form. A reporting form prices on the values you report as starts break ground, which rewards builders whose reporting is disciplined and current.
Bring us the project list, starts planned, completed values, and expected durations, and the builders risk conversation becomes a real number quickly. The requirements guide covers what your lender will check about the policy once it exists.
Get a quote from Segreve & Hall
Three ways in, all reaching the same agency in Andover. Bring your current declarations if you have them, the projects you have underway and starting this year with their completed values, your payroll split between your own crews and your subs, and any builders risk or certificate requirements a lender, buyer, or town is asking you to meet. No coverage can be bound by voicemail, email, or a form submission alone; binding requires a conversation and confirmation, which is how it should work.