Massachusetts · Home Builders & Builder-Developers

Starting a building business in Massachusetts

Starting a building company in Massachusetts: the order of operations

Most new builders buy insurance in the order a problem forces them to: the permit counter asks for a license, the lender asks for builders risk, the first hire triggers comp. Working the list in order is cheaper and leaves no gaps. This is the sequence we walk new Massachusetts building companies through, with the rule behind each step.

  1. Form the entity and register the business. LLC or corporation, EIN, Massachusetts registration, and a business bank account. The entity is what your policies, contracts, and certificates will name, so it comes first; changing it later means reissuing all of them.
  2. Get the Construction Supervisor License in place. Building permits require a named supervisor licensed under 780 CMR 110.R5, restricted is enough for one and two family work. If the license is yours, the business depends on you personally at every permit counter; a second license holder is succession planning, not luxury. The requirements guide has the license table.
  3. Register as an HIC only if the work triggers it. New construction is outside the HIC law; additions and renovations on existing owner-occupied homes are inside it, with registration, written contracts over $1,000, and the one-third deposit cap. Many builders hold the registration because their book mixes both.
  4. Workers' comp before the first hire. Coverage is required from the first employee, for any hours, under M.G.L. c. 152, § 25A, and building departments check comp compliance at the permit counter. Decide deliberately whether owners are covered or excluded; do not let the default decide.
  5. General liability with completed operations, from the first house. The first home you close starts its six-year statute of repose clock, and the policy that answers a year-three defect claim is the one in force when the damage occurs. Continuous coverage from day one is the cheapest version of this protection there is.
  6. Set the builders risk system before the first financed start. Decide single-project policies or a reporting form, agree with your lender's insurance exhibit, and make reporting a new start part of breaking ground, not an afterthought. An unreported start on a reporting form is an uninsured house.
  7. Build the subcontractor paperwork system before the first sub. Written subcontracts, certificates collected before work starts, additional insured and waiver endorsements, and an expiration tickler. It is far easier to require paperwork from a sub who wants the work than from one who has already been paid. The system is the subcontractor guide.
  8. Commercial auto and the equipment schedule. Title the trucks to the company, list every driver, schedule the trailers and the machines, and add hired and non-owned auto for the errands your crew runs in personal vehicles.
A carpenter framing a wall on the upper floor of a house under construction, with tools and lumber staged nearby
The first house sets the pattern: the license, the builders risk, the certificates, and the comp classes you set up here are the ones your audits will test for years.

What lenders, buyers, and towns will ask you for

  • The lender: a builders risk policy at full completed value naming the lender as mortgagee, plus evidence of liability and comp before draws
  • The buyer and their attorney: proof you are licensed and, for work on existing homes, HIC registered; certificates of insurance at signing
  • The building department: a CSL holder named on the permit and proof of comp compliance
  • The planning board, if you develop: subdivision security under c. 41, § 81U before lots are released
  • Your subs' carriers, at your audit: nothing. The asking runs the other way, and it runs to you

None of these requests is unreasonable, and every one of them is easier answered from a system than from a scramble. That is the entire pitch for setting the program up in this order.

Get a quote from Segreve & Hall

Three ways in, all reaching the same agency in Andover. Bring your current declarations if you have them, the projects you have underway and starting this year with their completed values, your payroll split between your own crews and your subs, and any builders risk or certificate requirements a lender, buyer, or town is asking you to meet. No coverage can be bound by voicemail, email, or a form submission alone; binding requires a conversation and confirmation, which is how it should work.